top of page

Gas Turbine Casing Manufacturing & Repair Plant (Global 500 Division)

Client Challenge

  • Alstom needed to replicate the successful Turbine Repair transformation at a separate Gas Turbine Casing plant — different product line, workforce, and operational cadence

  • The plant was unprofitable with manufacturing cycle times exceeding 8 months

  • A pre-sale transformation: the plant was being positioned for acquisition

Client Solution

  • Model Transfer: Assessed transferability of the proven operating model and tailored the future-state ETC framework for casing manufacturing

  • Redesign: Rebuilt organizational structure, process workflows, roles, and technology stack with a 5+ person matrix team

  • Lean Discipline: Gemba Walks and Complexity Lean Value Stream Mapping drove the redesign

  • ERP: Implemented the JDE configuration supporting the new processes

Client Impact Results

  • Cycle Times: Reduced from 8+ months to under 3 months

  • Profitability: Unprofitable plant became a positive contributor

  • Transferability: Operating model validated across a second manufacturing context in 6 months

  • Outcome: Plant subsequently acquired by GE

Client Technologies

  • JD Edwards ERP

  • ETC process methodology

  • Complexity Lean Value Stream Mapping

  • Gemba Walks

  • Organizational design

  • Matrix team management

bottom of page