Company Type
Zamma, a PE-backed manufacturer of laminate-flooring moldings, trim, and accessories, in post-acquisition turnaround; a buy-vs-build assessment to the operating partner concluded build.
What Drove the Need
Scheduling and execution of slitter (process) work centers ran on a complex spreadsheet; the item master was another workbook
Master data that GP lacked — slit sub-component SKUs, multi-level BOMs, UOM schedules — did not exist
Business Impact
Over 97% of data entry errors eliminated; major material shortages resolved; chargeback crisis resolved (Case 28)
94% of post-go-live functionality traced to client requests through the component register
Systems/Data Integration
One-way integration from on-premises Microsoft Dynamics GP 2013; return write-back designed, then removed at the client's request
Design
Master data auto-generated where GP lacked it: slit sub-component SKUs with an invented naming schema (finished-roll SKU + width), customer groups coded into the item-number schema, paper finish/type master as the matching key, three-level BOMs, UOMs and conversion schedules, work-order status lifecycle, soft-coded master code categories, and item-name templates classifying finished goods to auto-pair slit sub-components
Slitter work orders: auto-generated sub-component options; up to two ad hoc items created on demand via a five-step template-replication chain in one transaction; real-time validation that total slit requirements fit the selected roll; role-specific saved grid views
Component register with requested-by/designed-by/developed-by attribution per function — a traceability matrix doubling as a scope-change audit
Core functionality designed and built in 4.5 months; enhancements and fixes in the month after go-live; users migrated off legacy tools and trained
Technology Stack
Oracle Database 12c; Oracle APEX 18.2; Oracle REST Data Services; PL/SQL
APEX Office Print (AOP) for tag-templated Word/PDF output
ORDO — Oracle APEX Cloud Process & Discrete Manufacturing Application
Replaced the Excel spreadsheet scheduling the critical slitter work centers and the Excel item master with a hosted Oracle APEX application: master data auto-generated, three-level BOMs, work-order lifecycle, allocation and shortage inquiries, and a one-way integration from Dynamics GP.