top of page

Company Type
Alstom Power — Turbine & Generator Repair, the Global 500 turbine/generator repair division; reporting layer of the ETC operating model.
What Drove the Need
Project status reporting took more than a week and was right about half the time
Business Impact
Project status reporting from 1+ week at 50% accuracy to under 1 day at 98% accuracy (Case 1)
Systems/Data Integration
JDE World
Design
Exception-based reports over JDE project, work-order, and cost data
Technology Stack
JDE-integrated custom reporting
Management-By-Exception / Operational Reporting System
Exception-based operational reporting supporting the Estimating-to-Cash operating model.

bottom of page